Clarke Energy will be exhibiting at 2015 HefmA National Conference at the Hilton Hotel, Blackpool, 14th- 15th May 2015.
With an increased pressure on the NHS to reduce costs and lower emissions, there has never been a better time to look into the possibility of installing a combined heat and power system (CHP). Join us to find out how a well designed and installed system can enable hospitals to spend more on treatment and less on power.
NHS – 50MW Installed Capacity
Following our recent sale of a 1.4MW GE Jenbacher gas engine to St Bartholomew’s Hospital, London, we are proud to confirm that we have reached 50 MW installed capacity within the NHS.
St Bartholomew’s combined cooling and heating system (CCHP) is the first of its kind under a strategic collaboration between SDCL, Clarke Energy, GE and the NHS Confederation. Delivered by Skanska, the project is part of SDCL’s “Powering Health” collaboration to deliver a low-carbon, combined cooling, heating and power solution as part of the first fully financed PFI deal within the NHS.
Further installations Include:
- Guy’s and St Thomas’, London
- Great Ormond Street
- Freeman Hospital
- Neville Hall Hospital
Please join us for what will prove to be an educational and informative event.