HELECTOR selected Clarke Energy Hellas to supply and install a 3.52MW landfill gas power plant in Thessaloniki, Greece.
Biogas Case Studies
2.9MW Combined Heat and Power at ECOTERRA Biogas, Romania
The largest biogas plant in Romania was developed by Clarke Energy Romania (former TEB Energy Business). Moara Project was designed to function on renewable energy sources to produce biogas from...
Bioaerio Pellas 0.95MW CHP Plant, Greece
 JMS 320 GS-BL v.C25 CHP unit producing electric power of 0.95 MW
Verneuil, Dairy Cooperative
Verneuil, Dairy Cooperative – A Case Study
Brima Sagar Distillery Biogas Plant
Case study of Brima Sagar’s distillery effluent biogas cogeneration plant
Maize Products Biogas CHP Gujarat
Maize Products’ biogas CHP plant
Koyambedu Sewage Treatment Power Plant
Koyambedu Sewage Treatment Plant CHP
Idex Environnement’s Biogas plant at Amiens
Clarke Energy has delivered a full turnkey installation for the Amiens Biogas plant.
Tamar Energy’s Basingstoke Biogas CHP Plant
Tamar Energy’s Basingstoke CHP Plant uses Food Waste to Create Biogas
United Utilities, Davyhulme WWTW, CHP Plant
United Utilities, Davyhulme WWTW, CHP Plant
Jain Irrigation System’s biogas trigeneration
Case study for Jain Irrigation’s biogas trigeneration Unit, India
Bord na Móna’s Drehid Waste Management Facility
Irish Drehid Waste Management facility manages up to 360,000 tonnes of waste
Poitevinière ISDND landfill gas power plant
Case study for Brangeon Group’s French landfill site at Poitevinière
Plessis Gassot’s Landfill Gas Power Plant Linked to District Energy
Plessis Gassot landfill gas power plant case study. Clarke Energy replied to a call for tenders launched in 2009 by the Véolia Propreté group.
Clarke Energy & Agri-gen Creating Renewable Energy from Waste Heat
Clarke Energy & Agri-gen Creating Renewable Energy from Waste Heat using ORC
Major Biogas Engine Orders: Tamar Energy
Clarke Energy Secures Series of Major Biogas Engine Orders with Tamar Energy
Waste Used to Energise the Irish Economy with Renewable Power, Jobs and Growth
Clarke Energy signs Contract signed with Bord na Móna for 5.6MW landfill gas power plant
Letter of appreciation from Bayer CropScience
Bayer CropScience provides letter of appreciation for Clarke Energy’s installation and service support.
Harper Adams College Anaerobic Digester CHP Plant
Harper Adams College Anaerobic Digestion CHP Plant Installed by Clarke Energy
Bolivar WWTP Cogeneration Facility
Press Release: Bolivar WWTP processing almost 70% of Adelaide’s metropolitan wastewater
Any Further Questions?
If you have any technical questions that need answering, would like to arrange to speak to a sales advisor or book a feasibility study.