Apr 15, 2021 | Case Study, Jenbacher Type-6 Gas Engines, News, Peaking Station Case Sudies, Romania, Romania Case Studies, Romania News
Clarke Energy supplies Nova Power & Gases’ gas-fuelled peaking station with four INNIO Jenbacher J620 gas engines. The project will improve efficiency and stability of power to the Reif Industrial Park. Construction is ongoing at power plant located in Campia...
Jan 18, 2017 | Biogas, Biogas Case Studies, Case Study, Jenbacher Case Studies, Romania Case Studies
The largest biogas plant in Romania was developed by Clarke Energy Romania (former TEB Energy Business). Moara Project was designed to function on renewable energy sources to produce biogas from energy crops (field corn refuse). The two Jenbacher Type-4 engines use...
Jan 18, 2017 | Case Study, Jenbacher Case Studies, Natural Gas Case Studies, Romania Case Studies
The 22.8MW full turnkey power plant project at VEST ENERGO was completed in three stages. The generated electricity produced by the engines is injected in National Energy System (SEN), while the heat is delivered to Bucharest’s district-heating system (RADET). Clarke...
Jan 18, 2017 | Case Study, Natural Gas Case Studies, Romania Case Studies
BEPCO was the first large scale district heating project in Romania utilising internal combustion engines. BEPCO built, owns and operate four cogeneration power plants for district heating în Brasov; The electricity is injected in SEN (National Power Grid), while the...