Clarke Energy is proud to play a key role in Morocco’s energy future through our involvement in the Tendrara gas field project. This strategic initiative, undertaken in collaboration with Italfluid Geoenergy Srl, will enhance the country’s energy security and infrastructure.
Delivering Reliable Power Solutions
To support this vital project, Clarke Energy has supplied and installed nine high-performance engines, designed to meet the operational needs of the site. These include:
– Seven INNIO Jenbacher JMS 612 gas engines (2260 kVA each)
– Two Rehlko engines (1600 kVA each)
All engines have been integrated into containerised systems, ensuring efficiency and resilience in the extreme desert conditions.
Project Phases: Strengthening Morocco’s Energy Infrastructure
The Tendrara gas field development is structured in two key phases:
- Gas treatment and liquefaction – The processed gas will be transported by truck across Morocco, increasing energy accessibility.
- Pipeline infrastructure – The project will eventually power blowers for a future pipeline, reinforcing the national energy grid.
Additionally, the site will supply power to the technical platform currently under development, further expanding Morocco’s energy capabilities.
Engineering for Extreme Conditions
Clarke Energy brings extensive expertise in designing and managing power generation systems that can withstand extreme environments. The Tendrara site will operate efficiently in temperatures ranging from -15°C to +47°C, ensuring uninterrupted energy supply in the harsh desert climate.
With an expected in-service date of Q3 2025, this project represents a major step forward in Morocco’s energy independence. Clarke Energy remains committed to delivering reliable, sustainable power solutions, supporting a cleaner energy future.