Sebewaing Light and Water CHP Plant, Michigan, USA
Case Study
Clarke Energy to Supply Turnkey CHP Plant for Municipal Electricity Utility in Michigan
Clarke Energy to Supply Turnkey CHP Plant in Michigan, USA
Two CoEnergy America CHP Units Powering Cape Codder Resort & Spa
CoEnergy America has worked with the Cape Codder on multiple occasions to develop clean energy solutions.
St. Cloud Wastewater Install Biogas and Natural Gas Engine, USA
St. Cloud Wastewater Treatment Facility, USA: Case Study
Autoliv, Airbags International CHP plant
Autoliv, Airbags International CHP case study
La Gabarre landfill gas power plant, Guadeloupe
La Gabarre landfill gas power plant
Caledonian Cheese, BasePower CHP plant, UK
Caledonian Cheese and Base Power’s CHP plant, Stranraer
Plastic Omnium, BasePower, CCHP plant, UK
Plastic Omnium, BasePower, CCHP plant case study
Psyttalia Wastewater Treatment Plant Athens Water Supply and Sewerage Company
Psyttalia Waste Water Treatment Plant is the main WWTP in the area of Athens
BEAL Ano Liossia Landfill Site
BEAL S.A. is the operator of the cogeneration facility fueled by biogas (landfill gas) from Ano Liossia landfill.
6MW Biogas Plant Installed at Selected Biogas Farsala, Greece
The four containerised CHP units will be fueled with biogas produced from anaerobic digestion process.
Techniki Bioenergiaki Kritis Biogas Plant
Cogeneration plant located in the Industrial Area of Heraklion, Crete.
2.9MW Combined Heat and Power at ECOTERRA Biogas, Romania
The largest biogas plant in Romania was developed by Clarke Energy Romania (former TEB Energy Business). Moara Project was designed to function on renewable energy sources to produce biogas from...
22.8MW Full Turnkey Power Plant Delivered to VEST ENERGO, Romania
Energia electrică generată de motoare este injectată în Sistemul Energetic Național (SEN), în timp ce căldura este livrată sistemului de încălzire centralizată (RADET) din București.
BEPCO Brașov 42.7MWe District Heating Project, Romania
BEPCO was the first large scale district heating project in Romania utilising internal combustion engines.
Carthage Grains CHP Plant, Tunisia
A case study of Carthage Grains CHP plant in Tunisia
Pine Street Shelter Select 85kW CHP System from CoEnergy America
The Pine Street Inn uses 100% of the electricity and 95% of the thermal output produced by the CHP unit.
Biogen food waste anaerobic digestion plant, St Asaph
Biogen Food Waste AD Plant: A Case Study
Viyellatax Cogeneration Plant, Bangladesh
Viyellatex textile mill CHP plant case study, Bangladesh
Badsha Textiles captive power plants, Bangladesh
Badsha Textiles’ captive power plants case study, Bangladesh
Any Further Questions?
If you have any technical questions that need answering, would like to arrange to speak to a sales advisor or book a feasibility study.