Dec 15, 2015 | Case Study, CoEnergy America, USA Case Studies
Overview As DHAC’s business has grown over the years, the property has needed multiple renovations and expansions, and recently through a comprehensive energy efficiency project, the old boilers were replaced and a CHP system was installed. An Amerigen 8150 CHP was...
Dec 15, 2009 | Case Study, CoEnergy America, USA Case Studies
Overview In addition to high utility bills, Bethany Health Care Center was regularly plagued with brown-outs (power shortages from the electricity grid). For a critical care facility, attempting to operate during such brownouts is very difficult and dangerous. As a...